Posts by Gyrfalcon88
Winter/Spring 2018 to 2019: Part 2, Other updates
We returned from PT on November 16. It was good to be back in our slip, but we had one more big project this year, so we headed over to Lake Union Boat Repair, the Seattle shop that has done most of our non-wood work. New mufflers/fiddley cover: We have had an exhaust leak for…
Read MoreWinter/Spring 2018 to 2019: Part 1, Haulout and repairs
We had an unfortunate encounter with a rock in Canada in August of 2018. Like many unfortunate occurrences, a number of mistakes, mishaps, and miscalculations occurred (mostly related to dependence on electronics, distractions, lack of local knowledge, and miscalculations). As a result, we (1) fixed some navigation problems, (2) became much more adamant about people…
Read MoreGulf Islands and Victoria 2018
Our long trip during the summer of 2018 was up to the Gulf Islands and to Victoria for the Wooden Boat Festival. We don’t seem to have lots of photos, but we will at least include the route images. 24 August 2018: Ewing St Moorings to Port Townsend Anchorage Our friends Peggy and Randy had…
Read MoreSummer projects 2018
During the summer of 2018, we started working on some delayed maintenance for paint and varnish. The exterior surfaces had been painted as part of the original work we did on the boat 6 years ago. There were areas of varnish and paint that needed attention. Our excuse is the two years spent in exile…
Read More2018 BIG projects #2: Sonar removal
The second project was the removal of the sonar structure attached to the hull. Note: We’ve revised this part of the blog, as we’ve gotten more information about the sonar from a previous owner. It has not been functional as long as we have had the boat, and likely for several years prior to that…
Read More2018 BIG projects #1: Haulout and Destruction and reconstruction; Starboard sponson/guard
We did not haul the Gyrfalcon last year. We felt like we needed a break from big wood projects. In the meantime, we had the anchor winch rebuilt, so it wasn’t like we were ignoring the boat’s needs. There are a couple of large wood projects left on the boat, and we decided to begin…
Read MoreOdds and ends from 2016-2018
2016 to 2018 were busy years. In the beginning of 2017, Nancy returned full time to Seattle after working in South San Francisco for 2 years. Before her return, we managed to get in a few boat projects between round trips to/from SFO/SEA, but not as many as we wanted. There are always unfinished projects…
Read MoreAug/Sept 2017: San Juans, Gulfs, and Victoria Classic Boats
This was our first trip after the installation of the renovated winch was a 12-day trip to the San Juan and Gulf Islands, and to Victoria BC for the Classic Boat Festival. August 25 (Day 1: Home to Port Townsend) Our friend Ricardo flew in from the East Coast and his daughter Marcia arrived after…
Read MoreThe Year of the Winch
Note: we found some more photos after we had posted this–so if you read this when we first posted, skim through and see the additional photos of the winch project. The anchor winch on the Gyrfalcon is a major piece of work. Built in 1941, it has been lifting the anchors ever since. The anchors…
Read More2016 Winter Trip to the South Sound (December/January 2016/2017)
Our friends from Maryland, John and Ellyn, came out to Seattle for a leisurely weeklong trip on the Gyrfalcon. There’s nothing quite as relaxing as being in a warm boat on calm seas in the winter in the PNW. Thanks to John for providing his photos of the trip to supplement mine–I apparently was not…
Read More
