2018 BIG projects #2: Sonar removal

By Gyrfalcon88 / March 17, 2018 /

The second project was the removal of the sonar structure attached to the hull. Note:  We’ve revised this part of the blog, as we’ve gotten more information about the sonar from a previous owner.  It has not been functional as long as we have had the boat, and likely for several years prior to that…

Read More

2018 BIG projects #1: Haulout and Destruction and reconstruction; Starboard sponson/guard

By Gyrfalcon88 / March 12, 2018 /

We did not haul the Gyrfalcon last year. We felt like we needed a break from big wood projects. In the meantime, we had the anchor winch rebuilt, so it wasn’t like we were ignoring the boat’s needs. There are a couple of large wood projects left on the boat, and we decided to begin…